Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Riverside(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Riverside
City of Riverside Public Works Department / Community and Economic Development Department
Permit
Permit / AuthorizationGrading Permit with Water Quality Management Plan (WQMP)
Submit ToCity of Riverside Public Works Department / Community and Economic Development Department
Lead TimePlan review 4–6 weeks; WQMP reviewed concurrently with grading/building permit
Application MethodOnline or in-person via City of Riverside permit center; WQMP submitted as part of permit application
FeeGrading permit fees per project scope; WQMP review fee included
Water Quality
Impervious Cover LimitNo citywide cap; projects creating ≥ 5,000 sq ft of new impervious surface require a project-specific WQMP
On-Site Treatment RequiredYes
Detention RequiredYes — Retain the 85th-percentile 24-hour storm event using LID BMPs; infiltration preferred in areas with suitable soils; bioretention or proprietary treatment accepted elsewhere
Turbidity / Discharge StandardMust comply with state CGP and Santa Ana Regional Water Board Basin Plan objectives
SWPPP
SWPPP / Local Plan RequiredYes — Project-specific Water Quality Management Plan (WQMP) for post-construction; SWPPP per state CGP for construction
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity conducts grading inspections and BMP installation verification. Post-construction BMPs require recorded maintenance agreements with annual self-inspection.
Inspector QualificationQSP/QSD per state CGP; no additional city certification
Design & Zones
Local Design ManualRiverside County WQMP Guidance / Santa Ana Region BMP Design Manual
Special Overlay ZonesSanta Ana River Watershed, Hillside / Steep Slope Overlay