Local
City of Sacramento
City of Sacramento Community Development Department / Department of Utilities
Permit
Permit / AuthorizationGrading Permit with Stormwater Quality Design Manual Compliance
Submit ToCity of Sacramento Community Development Department / Department of Utilities
Lead TimePlan review 3–6 weeks; stormwater compliance review concurrent with grading/building permit
Application MethodOnline via City of Sacramento Accela portal; stormwater quality plan submitted with permit application
FeeGrading permit fee based on project area and earthwork; stormwater review fee included
Water Quality
Impervious Cover LimitNo citywide cap; projects creating or replacing ≥ 5,000 sq ft of impervious surface trigger LID requirements
On-Site Treatment RequiredYes
Detention RequiredYes — Treat runoff from the 85th-percentile 24-hour storm using LID measures; infiltration required where feasible given Central Valley clay soils; detention/retention or biofiltration alternatives accepted
Turbidity / Discharge StandardMust comply with state CGP Risk Level standards and Central Valley Regional Water Board Basin Plan
SWPPP
SWPPP / Local Plan RequiredYes — Grading-phase Erosion and Sediment Control Plan; post-construction Stormwater Quality Design Plan
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity conducts grading and erosion control inspections during construction. Post-construction LID facilities require recorded maintenance agreements and annual self-inspections.
Inspector QualificationQSP/QSD per state CGP; no additional city-specific certification
Design & Zones
Local Design ManualCity of Sacramento Stormwater Quality Design Manual
Special Overlay ZonesFlood Zone / Levee-Protected Area, American River Parkway Buffer