SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Fort Lauderdale(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Fort Lauderdale
City of Fort Lauderdale Development Services / SFWMD
Permit
Permit / AuthorizationBuilding/Site Plan Permit with Stormwater Management / SFWMD ERP
Submit ToCity of Fort Lauderdale Development Services / SFWMD
Lead TimeCity review 2–4 weeks; SFWMD ERP review 4–8 weeks
Application MethodCity permits via Fort Lauderdale PLUS (ePlans); SFWMD ERP via ePermitting portal
FeeCity permit fees per project scope; SFWMD ERP fee $500–$8,000+
Water Quality
Impervious Cover LimitNo citywide cap; stormwater treatment required for all new development per SFWMD ERP and City Code
On-Site Treatment RequiredYes
Detention RequiredYes — Pre- vs. post-development discharge rate matching for 25-year/72-hour storm; water quality: 1 inch over project area or 2.5× impervious percentage per SFWMD
Turbidity / Discharge StandardMust comply with FDEP Generic Permit and Florida surface water quality standards
SWPPP
SWPPP / Local Plan RequiredYes — Erosion and Sediment Control Plan; Stormwater Management Plan per SFWMD ERP
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity inspects construction sites. SFWMD conducts ERP compliance inspections. Post-construction systems require maintenance entity and recorded covenant.
Inspector QualificationNo state-specific certification required; CPESC/CESSWI recognized
Design & Zones
Local Design ManualSFWMD ERP Applicant's Handbook Volume II / Broward County Water Management Standards
Special Overlay ZonesCoastal Zone / Intracoastal Waterway, Wellfield Protection Zone