SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

Miami-Dade County (Unincorporated)(3 more)

Rows with an amber indicator differ across selections.

Field
Local
Miami-Dade County (Unincorporated)
Miami-Dade County Department of Regulatory and Economic Resources (RER) / SFWMD
Permit
Permit / AuthorizationBuilding Permit with Stormwater Management / SFWMD ERP
Submit ToMiami-Dade County Department of Regulatory and Economic Resources (RER) / SFWMD
Lead TimeCounty review 2–4 weeks; SFWMD ERP review 4–8 weeks
Application MethodCounty permits via Miami-Dade iBuild portal; SFWMD ERP via ePermitting
FeeCounty permit fees per project value; SFWMD ERP fee $500–$8,000+
Water Quality
Impervious Cover LimitNo countywide cap; stormwater treatment per SFWMD ERP and County Code Chapter 24
On-Site Treatment RequiredYes
Detention RequiredYes — Pre- vs. post-development discharge rate matching for 25-year/72-hour storm; water quality: 1 inch over project area or 2.5× impervious percentage per SFWMD
Turbidity / Discharge StandardMust comply with FDEP Generic Permit and Florida surface water quality standards; Biscayne Bay OFW protections apply
SWPPP
SWPPP / Local Plan RequiredYes — Erosion and Sediment Control Plan; Stormwater Management Plan per SFWMD ERP
PE Stamp RequiredYes
Inspections
Inspection RequirementsCounty RER conducts construction-phase inspections. SFWMD conducts ERP compliance inspections. Post-construction systems require recorded maintenance entity and covenant.
Inspector QualificationNo state-specific certification required; CPESC/CESSWI recognized
Design & Zones
Local Design ManualSFWMD ERP Applicant's Handbook / Miami-Dade County Public Works Manual
Special Overlay ZonesBiscayne Bay Shoreline / Coastal Zone, Wellfield Protection Area, Everglades Buffer / West Urban Development Boundary