SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Orlando(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Orlando
City of Orlando Permitting Division / St. Johns River Water Management District (SJRWMD)
Permit
Permit / AuthorizationLand Clearing/Grading Permit with Stormwater Management / SJRWMD ERP
Submit ToCity of Orlando Permitting Division / St. Johns River Water Management District (SJRWMD)
Lead TimeCity review 2–4 weeks; SJRWMD ERP review 4–8 weeks for individual permits
Application MethodCity permits via Orlando Building & Permitting Services; SJRWMD ERP online via E-Permitting portal
FeeCity grading permit fees based on disturbed area; SJRWMD ERP fee $500–$8,000+
Water Quality
Impervious Cover LimitNo citywide cap; stormwater treatment required for all new development creating impervious surface per City Code Chapter 57 and SJRWMD ERP
On-Site Treatment RequiredYes
Detention RequiredYes — Pre- vs. post-development discharge rate matching for 25-year/24-hour storm; water quality: first 1 inch of runoff; lake-specific pollutant loading limits may apply
Turbidity / Discharge StandardMust comply with FDEP Generic Permit and Florida surface water quality standards; lake-specific TMDLs may impose stricter limits
SWPPP
SWPPP / Local Plan RequiredYes — Erosion and Sediment Control Plan per City Code; Stormwater Management Plan per SJRWMD ERP
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity inspects construction sites for erosion control. SJRWMD conducts ERP compliance inspections. Post-construction stormwater systems require maintenance entity and recorded maintenance plan.
Inspector QualificationNo state-specific certification required; CPESC/CESSWI recognized
Design & Zones
Local Design ManualSJRWMD ERP Applicant's Handbook / City of Orlando Engineering Standards
Special Overlay ZonesLake Protection Overlay, Wekiva Study Area / Springs Protection Zone