SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Tampa(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Tampa
City of Tampa Stormwater Department / Southwest Florida Water Management District (SWFWMD)
Permit
Permit / AuthorizationSite Development Permit with Stormwater Compliance / SWFWMD ERP
Submit ToCity of Tampa Stormwater Department / Southwest Florida Water Management District (SWFWMD)
Lead TimeCity stormwater review 2–4 weeks; SWFWMD ERP review 4–8 weeks for individual permits
Application MethodCity permits via Tampa Development & Growth Management; SWFWMD ERP via ePermitting portal
FeeCity site development permit fees vary; SWFWMD ERP fee $500–$8,000+
Water Quality
Impervious Cover LimitNo citywide cap; stormwater treatment required per SWFWMD ERP for projects exceeding thresholds (> 4,000 sq ft impervious or > 2 acres total area)
On-Site Treatment RequiredYes
Detention RequiredYes — Pre- vs. post-development discharge rate matching for 25-year/24-hour storm; water quality: treat first 1 inch of runoff per SWFWMD; wet detention ponds are the most common BMP
Turbidity / Discharge StandardMust comply with FDEP Generic Permit and Florida surface water quality standards; Hillsborough Bay and Tampa Bay protections apply
SWPPP
SWPPP / Local Plan RequiredYes — Erosion and Sediment Control Plan per City Code Chapter 26; Stormwater Management Plan per SWFWMD ERP
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity stormwater inspectors conduct construction-phase inspections. SWFWMD conducts ERP compliance inspections. Post-construction systems require maintenance entity and annual inspection records.
Inspector QualificationNo state-specific certification required; CPESC/CESSWI recognized
Design & Zones
Local Design ManualSWFWMD Environmental Resource Permit Applicant's Handbook Volume II
Special Overlay ZonesTampa Bay / Hillsborough Bay, Hillsborough River Watershed