SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Syracuse(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Syracuse
City of Syracuse Department of Neighborhood and Business Development / Onondaga County Department of Water Environment Protection (WEP)
Permit
Permit / AuthorizationBuilding Permit with Stormwater Management / Onondaga County Save the Rain
Submit ToCity of Syracuse Department of Neighborhood and Business Development / Onondaga County Department of Water Environment Protection (WEP)
Lead TimeCity permit review 2–4 weeks; county stormwater review concurrent
Application MethodCity permits via Syracuse Building Division; stormwater plans coordinated with Onondaga County WEP
FeeCity permit fees per project scope; county fees may apply for sewer connections
Water Quality
Impervious Cover LimitNo citywide cap; post-construction management required per NYSDEC MS4 permit; Save the Rain program promotes green infrastructure
On-Site Treatment RequiredYes
Detention RequiredYes — Manage the first 1 inch of rainfall on-site per NYS Stormwater Management Design Manual; Onondaga County ACJ (Amended Consent Judgment) drives aggressive CSO reduction
Turbidity / Discharge StandardMust comply with NYSDEC SPDES CGP; Onondaga Lake TMDL compliance
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per NYSDEC; stormwater management plan per Onondaga County WEP for sewer-connected projects
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity inspects construction. Onondaga County WEP inspects green infrastructure installations. Post-construction BMPs require maintenance agreements with county oversight.
Inspector QualificationNYSDEC-approved QI/TC per SPDES CGP; no additional city certification
Design & Zones
Local Design ManualNYS Stormwater Management Design Manual / Onondaga County Save the Rain Green Infrastructure Standards
Special Overlay ZonesOnondaga Lake Watershed, Combined Sewer Area