SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Carrollton(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Carrollton
City of Carrollton Development Services
Permit
Permit / AuthorizationGrading / Drainage Permit
Submit ToCity of Carrollton Development Services
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of Carrollton Development Services at 1945 E. Jackson Rd., Carrollton, TX 75006 or online portal
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage systems must accommodate design storm flows per Carrollton Drainage Design Criteria; city spans Dallas and Denton counties
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 10-, and 100-year storms per City of Carrollton Engineering Standards
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000 and not degrade Elm Fork Trinity River or Furneaux Creek
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Carrollton Development Services inspects grading permits at rough grading and final stabilization.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Carrollton Engineering Standards
Special Overlay ZonesElm Fork Trinity River Corridor, FEMA Special Flood Hazard Area