SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Edinburg(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Edinburg
City of Edinburg Public Works / Engineering
Permit
Permit / AuthorizationGrading / Drainage Permit
Submit ToCity of Edinburg Public Works / Engineering
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of Edinburg Engineering at 415 W. University Dr., Edinburg, TX 78539 or online portal at cityofedinburg.com
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage systems must accommodate design storm flows per Edinburg Drainage Design Criteria; Hidalgo County drainage district requirements apply for county-maintained channels
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 10-, and 100-year storms per City of Edinburg Drainage Design Criteria; flat RGV topography requires pump stations in some areas
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000 and not degrade Hidalgo County drainage system or Rio Grande tributaries
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Edinburg Public Works inspects grading permits at rough grading and final stabilization.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Edinburg Drainage Design Criteria
Special Overlay ZonesHidalgo County Drainage Districts, FEMA Special Flood Hazard Area, UTRGV Campus Zone