SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Grand Prairie(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Grand Prairie
City of Grand Prairie Development Services
Permit
Permit / AuthorizationGrading / Drainage Permit
Submit ToCity of Grand Prairie Development Services
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of Grand Prairie Planning & Development at 300 W. Main St., Grand Prairie, TX 75050 or online portal
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage systems must accommodate design storm flows; Dalton, Johnson, and Mountain Creek watersheds drain to Joe Pool Lake
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 10-, and 100-year storms per City of Grand Prairie Drainage Design Criteria; city straddles Dallas and Tarrant counties, requiring attention to applicable county standards
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000 and not degrade Joe Pool Lake, Mountain Creek Lake, or Trinity River tributaries
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Grand Prairie Development Services inspects grading permits at rough grading and final stabilization.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Grand Prairie Design Standards
Special Overlay ZonesJoe Pool Lake Watershed, FEMA Special Flood Hazard Area