SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Houston / Harris County(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Houston / Harris County
Harris County Flood Control District (HCFCD) for drainage design; City of Houston PWE for right-of-way and detention
Permit
Permit / AuthorizationHarris County Flood Control District (HCFCD) Permit + City of Houston Drainage Permit
Submit ToHarris County Flood Control District (HCFCD) for drainage design; City of Houston PWE for right-of-way and detention
Lead TimeDrainage design review: 4–8 weeks typical; Harris County review for HCFCD-regulated channels can take 6–12 weeks
Application MethodCity: ProjectDox online plan review portal (houston.permitsmarts.com); HCFCD: paper submittals to HCFCD offices
FeeCity of Houston drainage permit fee based on project type; HCFCD review fee varies by project complexity (typically $500–$5,000+)
Water Quality
Impervious Cover LimitNo citywide impervious cover cap (Houston has no traditional zoning); however, detention required for any net increase in runoff
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required for net increase in impervious cover; must attenuate 100-year storm to pre-development rates per Harris County Criteria (post-Harvey requirements significantly strengthened in 2018–2020); many projects must also meet 500-year storm attenuation in designated areas
Turbidity / Discharge StandardNo local numeric NTU limit; TCEQ TXR150000 narrative standard applies; drainage permit requires construction BMPs per City of Houston Infrastructure Design Manual
SWPPP
SWPPP / Local Plan RequiredYes — Stormwater Pollution Prevention Plan (SWPPP) per TCEQ; City requires ESC notes on grading plans
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Houston PWE inspects drainage and grading installations. HCFCD inspects permitted work within or adjacent to HCFCD-maintained channels. Construction inspections required before final certificate of occupancy.
Inspector QualificationPE-of-record responsible for drainage design compliance; no additional city-specific inspector certification required beyond TCEQ
Design & Zones
Local Design ManualHarris County Flood Control District Policy, Criteria and Procedure Manual (PCPM) + City of Houston Infrastructure Design Manual (IDM)
Special Overlay ZonesFEMA Floodway / Special Flood Hazard Area (SFHA), Harris County Flood Control District (HCFCD) Channel Setback, Subsidence-Affected Area