Permit
Permit / AuthorizationGrading / Drainage Permit
Submit ToCity of Kyle Development Services
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of Kyle Development Services at 100 W. Center St., Kyle, TX 78640 or online portal at cityofkyle.com
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitPortions of Kyle are within the Edwards Aquifer Recharge Zone or Contributing Zone — EAA rules may limit impervious cover to 15–30% on qualifying sites; areas over the Recharge Zone have strict impervious cover caps and water quality requirements
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 5-, 10-, 25-, and 100-year storms per City of Kyle and Hays County Drainage Criteria; Onion Creek watershed considerations apply
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000 and not degrade Onion Creek, Plum Creek, or Edwards Aquifer recharge features
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Kyle Development Services inspects grading permits at rough grading and final stabilization. Edwards Aquifer protection sites may require additional water quality inspections.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Kyle Development Standards / Hays County Drainage Criteria
Special Overlay ZonesEdwards Aquifer Recharge Zone, Edwards Aquifer Contributing Zone, Onion Creek Floodplain, Plum Creek Watershed