Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of McAllen(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of McAllen
City of McAllen Public Works / Engineering Department
Permit
Permit / AuthorizationDrainage / Grading Permit
Submit ToCity of McAllen Public Works / Engineering Department
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of McAllen permitting portal or in person at 1300 Houston Ave., McAllen, TX 78501
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage infrastructure must accommodate design storm flows; FEMA floodplain areas impose elevation and fill restrictions
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to attenuate post-development peak flows to pre-development levels for 2-, 10-, 25-, and 100-year storms per McAllen Drainage Criteria Manual; flat Rio Grande Valley topography requires careful hydraulic routing
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000 and not degrade Rio Grande or Arroyo Colorado water quality
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of McAllen Engineering Department inspects grading permits at key milestones. Hurricane season requires heightened BMP maintenance. Final stabilization inspection required before permit closeout.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of McAllen Drainage Criteria Manual
Special Overlay ZonesFEMA Special Flood Hazard Area — Rio Grande and Arroyo Colorado Floodplains, International Boundary Zone (Rio Grande), Arroyo Colorado / South Texas Water Supply Zone