Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Midland(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Midland
City of Midland Engineering Department / Development Services
Permit
Permit / AuthorizationGrading / Land Disturbance Permit
Submit ToCity of Midland Engineering Department / Development Services
Lead TimePlan review typically 2–3 weeks
Application MethodSubmit via City of Midland Development Services at 300 N. Loraine St., Midland, TX 79701 or online portal
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage systems must accommodate design storm flows
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 10-, and 100-year storms per City of Midland Drainage Design Standards; flat arid terrain with ephemeral draws requires careful storm routing
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000; Permian Basin caliche soils produce significant sediment loads when disturbed
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Midland Engineering Department inspects grading permits at rough grading and final stabilization. Summer thunderstorm season (July–September) can produce intense localized flooding.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Midland Drainage Design Standards
Special Overlay ZonesEphemeral Drainage Channels / Permian Basin Draws, FEMA Special Flood Hazard Area (SFHA)