City of Odessa Public Works / Engineering
Permit
Permit / AuthorizationGrading / Drainage Permit
Submit ToCity of Odessa Public Works / Engineering
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of Odessa Engineering at 411 W. 8th St., Odessa, TX 79760 or contact city engineering department
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage systems must accommodate design storm flows per Odessa Drainage Design Criteria; arid climate with flat Permian Basin topography
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 10-, and 100-year storms per City of Odessa Drainage Design Criteria; flat terrain and low permeability caliche soils require careful detention sizing; intense thunderstorms can exceed 100-year design storms
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000; Odessa has few perennial receiving streams — most drainage flows to playas or evaporates
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Odessa Public Works inspects grading permits at rough grading and final stabilization. Wind-blown sediment is a significant BMP concern during active construction.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Odessa Drainage Design Criteria
Special Overlay ZonesPlaya Lakes (Closed Drainage Basins), Oil Field Infrastructure Proximity