City of Pasadena(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Pasadena
City of Pasadena Public Works / Engineering
Permit
Permit / AuthorizationGrading / Drainage Permit
Submit ToCity of Pasadena Public Works / Engineering
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of Pasadena Permitting at 1149 Ellsworth Dr., Pasadena, TX 77506 or contact city engineering department
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage systems must accommodate design storm flows per City of Pasadena Drainage Design Criteria; industrial and petrochemical land use creates heightened water quality concerns
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 10-, and 100-year storms per City of Pasadena Drainage Design Criteria; low-lying terrain adjacent to the Houston Ship Channel requires careful drainage design
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000 and not degrade Galveston Bay, Houston Ship Channel, or Armand Bayou
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Pasadena Public Works inspects grading permits at rough grading and final stabilization. Industrial corridor construction requires enhanced BMP measures and coordination with facility environmental staff.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Pasadena Drainage Design Criteria
Special Overlay ZonesHouston Ship Channel Industrial Corridor, Armand Bayou Watershed and Nature Center, Harris County Flood Control District Bayou Channels