SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Richardson(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Richardson
City of Richardson Development Services
Permit
Permit / AuthorizationGrading / Drainage Permit
Submit ToCity of Richardson Development Services
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of Richardson Development Services at 411 W. Arapaho Rd., Richardson, TX 75080 or online portal
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage systems must accommodate design storm flows per City of Richardson Engineering Standards; city is largely built out with redevelopment as primary land use change
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 10-, and 100-year storms per City of Richardson Drainage Design Standards; redevelopment projects must demonstrate no increase in impervious cover runoff impact
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000 and not degrade Duck Creek, Cottonwood Creek, or Spring Creek
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Richardson Development Services inspects grading permits at rough grading and final stabilization.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Richardson Engineering Standards
Special Overlay ZonesDuck Creek Greenbelt Corridor, FEMA Special Flood Hazard Area