SW

Stormwater Directory

Compare Regulations

Compare city/county requirements side-by-side (up to 4 jurisdictions)

City of Waco(3 more)

Rows with an amber indicator differ across selections.

Field
Local
City of Waco
City of Waco Public Works / Engineering Department
Permit
Permit / AuthorizationGrading / Drainage Permit
Submit ToCity of Waco Public Works / Engineering Department
Lead TimePlan review typically 2–4 weeks
Application MethodSubmit via City of Waco Development Services at 300 Austin Ave., Waco, TX 76701 or online via city portal
FeeContact agency for current fee schedule
Water Quality
Impervious Cover LimitNo citywide impervious cover cap; drainage systems must accommodate design storm flows; Lake Waco watershed areas may have additional water quality requirements
On-Site Treatment RequiredNo
Detention RequiredYes — Detention required to limit post-development peak flows to pre-development levels for 2-, 10-, and 100-year storms per City of Waco Drainage Design Criteria Manual
Turbidity / Discharge StandardNo numeric NTU limit; discharges must comply with TCEQ TXR150000 and not degrade Brazos River, Lake Waco, or North Bosque River water quality
SWPPP
SWPPP / Local Plan RequiredYes — SWPPP per TCEQ TXR150000; drainage report required for local permit
PE Stamp RequiredYes
Inspections
Inspection RequirementsCity of Waco Public Works inspects grading permits at rough grading, drainage infrastructure installation, and final stabilization. Spring severe weather season requires active BMP maintenance.
Inspector QualificationNo city-specific certification required beyond TCEQ SWPPP requirements
Design & Zones
Local Design ManualCity of Waco Drainage Design Criteria Manual
Special Overlay ZonesLake Waco Watershed Protection Area, Brazos River Floodplain, North Bosque River Watershed