SW

Stormwater Directory

Compare Regulations

Compare state-level permit requirements side-by-side (up to 4 states)

AR(3 more)

Rows with an amber indicator differ across selected states.

Field
AR
Arkansas
NPDES ProgramState-Delegated
Permitting AgencyArkansas Department of Energy and Environment, Division of Environmental Quality (DEQ)
Permit NameNPDES General Permit ARR150000 (Construction Stormwater General Permit)
Construction Threshold≥ 1 acre of land disturbance, or < 1 acre if part of a larger common plan of development or sale that will ultimately disturb ≥ 1 acre
NOI Lead TimeNOI must be submitted and permit coverage obtained at least 7 days before construction activity begins
Application MethodOnline via Arkansas DEQ eDMR/eNOI web portal; paper NOI (Form SW-NOI) may also be submitted by mail to DEQ's Water Division
Permit Fee$0 — Arkansas does not charge a fee for the construction general permit NOI
SWPPP RequiredYes
PE Certification RequiredNo
SWPPP Template AvailableYes
Inspection FrequencyAt least every 14 calendar days and within 24 hours of a precipitation event that produces 0.5 inches or more of rain at the site
Inspector QualificationA knowledgeable employee or agent of the permittee must conduct inspections; Arkansas does not currently require a state-specific inspector certification. The inspector must be familiar with the SWPPP and the BMPs implemented at the site.
Post-Construction RequiredYes
Turbidity StandardNo numeric NTU limit in the construction general permit; narrative water quality standard applies