SW

Stormwater Directory

Compare Regulations

Compare state-level permit requirements side-by-side (up to 4 states)

CO(3 more)

Rows with an amber indicator differ across selected states.

Field
CO
Colorado
NPDES ProgramState-Delegated
Permitting AgencyColorado Department of Public Health and Environment, Water Quality Control Division (CDPHE WQCD)
Permit NameConstruction Dewatering and Stormwater General Permit (COR400000)
Construction Threshold≥ 1 acre of land disturbance (or < 1 acre if part of a larger common plan of development exceeding 1 acre)
NOI Lead TimeStormwater Management Plan (SWMP) must be developed before construction; permit coverage active upon filing NOI
Application MethodOnline via CDPHE's Stormwater Compliance Assistance Program (SCAP) portal
Permit Fee$340 annual fee; $170 for < 1 year of coverage
SWPPP RequiredYes
PE Certification RequiredNo
SWPPP Template AvailableYes
Inspection FrequencyEvery 14 days and within 24 hours of precipitation events producing ≥ 0.5 inches (or ≥ 0.1 inches in the semiarid zone)
Inspector QualificationStormwater Management Plan Inspector (SMPI) — must complete CDPHE-approved training course. Certification must be renewed every 3 years.
Post-Construction RequiredYes
Turbidity StandardNot specified as a numeric limit in the General Permit; discharges must comply with narrative water quality standards