Compare Regulations
Compare state-level permit requirements side-by-side (up to 4 states)
FL(3 more)
Rows with an amber indicator differ across selected states.
| Field | FL Florida |
|---|---|
| NPDES Program | State-Delegated |
| Permitting Agency | Florida Department of Environmental Protection (FDEP) |
| Permit Name | Generic Permit for Stormwater Discharge from Large and Small Construction Activities |
| Construction Threshold | ≥ 1 acre of land disturbance (or < 1 acre if part of a larger common plan) |
| NOI Lead Time | NOI must be submitted at least 2 business days before construction begins |
| Application Method | Online via FDEP's ePermitting system (www.fldepportal.com) |
| Permit Fee | $400 for projects < 5 acres; $600 for ≥ 5 acres; additional fees may apply for ERP |
| SWPPP Required | Yes |
| PE Certification Required | No |
| SWPPP Template Available | Yes |
| Inspection Frequency | At least every 7 days and within 24 hours of a storm event producing ≥ 0.5 inches of rainfall in a 24-hour period |
| Inspector Qualification | Stormwater Pollution Prevention Inspector — no specific state certification required, but must be trained and knowledgeable in stormwater BMPs |
| Post-Construction Required | Yes |
| Turbidity Standard | Discharges must not cause turbidity in receiving waters to exceed 29 NTU above background in Class III waters |