SW

Stormwater Directory

Compare Regulations

Compare state-level permit requirements side-by-side (up to 4 states)

KS(3 more)

Rows with an amber indicator differ across selected states.

Field
KS
Kansas
NPDES ProgramState-Delegated
Permitting AgencyKansas Department of Health and Environment (KDHE)
Permit NameNPDES Stormwater Runoff from Construction Activities General Permit (Permit KSR100000)
Construction Threshold≥ 1 acre of land disturbance; < 1 acre if part of a larger common plan of development or sale that will ultimately disturb ≥ 1 acre
NOI Lead TimeNOI must be submitted to KDHE Bureau of Water at least 2 business days before the commencement of construction activities; permit coverage is effective upon submittal of a complete NOI
Application MethodOnline via KDHE's Electronic Document Management System (EDMS) or paper NOI submitted to KDHE Bureau of Water, Stormwater Section in Topeka; online submission is preferred
Permit Fee$100 per NOI filing (flat fee); no acreage-based fee structure for the construction general permit
SWPPP RequiredYes
PE Certification RequiredNo
SWPPP Template AvailableYes
Inspection FrequencyAt least every 14 days and within 24 hours after any storm event resulting in a discharge; sites in high-quality water areas or near impaired waters may require more frequent inspections
Inspector QualificationInspector must be a qualified person designated by the operator who is knowledgeable in the principles and practice of stormwater pollution prevention; Kansas does not require a state-specific inspector certification for construction stormwater, but CPESC or CESSWI credentials are recognized
Post-Construction RequiredYes
Turbidity StandardNo numeric NTU effluent limit in the general permit; narrative water quality standards apply