NPDES ProgramState-Delegated
Permitting AgencyLouisiana Department of Environmental Quality (LDEQ)
Permit NameLPDES Construction Stormwater General Permit (Permit LAR100000)
Construction Threshold≥ 1 acre of land disturbance; < 1 acre if part of a larger common plan of development or sale that will disturb ≥ 1 acre in total
NOI Lead TimeNotice of Intent (NOI) must be submitted to LDEQ at least 2 days before commencement of construction activities; permit coverage is effective 2 days after a complete NOI is received; some sensitive areas may require a longer review period
Application MethodOnline via LDEQ's Electronic Document Management System (EDMS) portal at https://edms.deq.louisiana.gov/; paper NOI also accepted and submitted to LDEQ's Water Permits Division in Baton Rouge
Permit Fee$100 per NOI submission (flat administrative processing fee); no acreage-scaled fee for the construction general permit
SWPPP RequiredYes
PE Certification RequiredNo
SWPPP Template AvailableYes
Inspection FrequencyAt least every 7 days and within 24 hours after a storm event resulting in a discharge from the site; inspection frequency may be reduced to every 14 days for portions of the site that have achieved temporary or final stabilization
Rain Inspection TriggerWithin 24 hours of any storm event resulting in a discharge from the site (discharge-based trigger)
Inspector QualificationInspections must be conducted by a qualified inspector who is knowledgeable in the principles and practice of stormwater pollution prevention; LDEQ does not require a specific state-issued inspector certification for construction stormwater, though Certified Inspector of Sediment and Erosion Control (CISEC) or CESSWI credentials are recognized industry standards
Inspector CertificationsNo state-specific cert required; inspector must have 'sufficient training and experience'; CPESC, CESSWI, CISEC accepted
Post-Construction RequiredYes
Turbidity StandardNo numeric NTU effluent limit in General Permit LAR100000; narrative water quality standards apply