SW

Stormwater Directory

City of Oakland

City of Oakland Bureau of Building / Public Works Department

CityMS4 Phase IVerified 2026-03

Local Permit / Authorization

Permit Required
Yes
Permit Name
Grading Permit with C.3 Stormwater Treatment Compliance
Submit To
City of Oakland Bureau of Building / Public Works Department
Lead Time
Plan review 4–8 weeks; C.3 compliance reviewed as part of building/grading permit
Application Method
Online via City of Oakland permit portal; C.3 stormwater control plan submitted with permit package
Fee
Included in grading/building permit fees; no separate stormwater fee

Water Quality Standards

Impervious Cover Limit
No citywide cap; C.3 requirements triggered at ≥ 10,000 sq ft of new or replaced impervious surface
On-Site Treatment Required
Yes
Detention Required
Yes
Detention Standard
Treat 85th-percentile 24-hour storm using LID; bioretention, permeable pavement, or infiltration; hydromodification management required for most projects per MRP
Turbidity Standard
Must comply with state CGP and San Francisco Bay Regional Water Board Basin Plan objectives

Local SWPPP / Drainage Plan

Local Plan Required
Yes
Plan Name
C.3 Stormwater Management Plan for post-construction; SWPPP per state CGP for construction phase
PE Stamp Required
Yes
C.3 plan must be prepared by a registered Civil Engineer. Oakland implements the Municipal Regional Permit (MRP) issued by the SF Bay Regional Water Board, consistent with other Alameda County co-permittees.

Local Inspection Requirements

Requirements
City inspects BMP installation during construction. Post-construction C.3 facilities require recorded maintenance agreements, annual self-inspections, and periodic city verification.
Inspector Qualification
QSP/QSD per state CGP; no additional city certification

Special Overlay Zones

Oakland Hills Fire Zone
Trigger: Properties in the Oakland Hills designated fire zone
Restriction: Enhanced erosion control for fire-damaged or cleared slopes; revegetation requirements; additional grading restrictions on steep slopes
Coastal Zone / Port Area
Trigger: Properties within the Oakland waterfront and port area
Restriction: Enhanced water quality protection for San Francisco Bay; industrial stormwater permit may apply; BCDC review for Bay fill or shoreline projects

Design Manual

Manual Name
Alameda County Clean Water Program C.3 Stormwater Technical Guidance

Jurisdiction Notes

Oakland implements the MRP (Municipal Regional Permit) through the Alameda County Clean Water Program. C.3 requirements are regionally consistent across Alameda County. The city's hilly terrain and proximity to the Bay make erosion control and water quality treatment especially important.

Remember: These local requirements are in addition to the SWRCB state construction permit. Both must be satisfied before breaking ground.
Disclaimer: This information is provided for general reference only. Always verify requirements directly with City of Oakland Bureau of Building / Public Works Department and the agency website before beginning construction.